← Back to all workshops and audits
On-Site Consultation & Physical Site Inspection

On-Site Facility Power & Airflow Audit

An on-location technical assessment of regional Victorian sheds, barns, and commercial workshops preparing for mining hardware.

1 Full Day on site + 5 Business Days for final technical blueprint
Single facility engagement
Pricing & Investment
$1,980 AUD (Gippsland / Central VIC) + travel allowance for remote sites
Location: Client facility within Victoria (metro & regional)
Industrial facility electrical distribution panel and thermal inspection gear

Target Audience & Prerequisites

Who this is for: Property owners, agricultural businesses, and private operators planning 10kW to 250kW dedicated hardware installations.

Lead Instructor: Callum Vance (Facility Engineering Lead)

Preparation: Ensure unhindered access to property main switchboards, sub-panels, supply meters, and structural shed openings.

Safety Constraints: Site must possess a verifiable grid connection or operational generation source with clear access.

Delivered Outcome & Real Result

A clear, actionable site feasibility report detailing exact switchboard upgrades needed, acoustic attenuation requirements for council compliance, exhaust fan sizing, and electrical schematics ready for your local licensed electrician.

Curriculum & Technical Scope

Core Topics Covered

  • Main switchboard and sub-meter capacity testing
  • Thermal load modeling based on regional Victorian summer peaks
  • Louvre, exhaust fan, and acoustic barrier placement mapping
  • Network cabling, surge suppression, and emergency power cut-off architecture

Inclusions & Exclusions

What is Included:
  • On-site thermal baseline and acoustic baseline logging
  • Written electrical scope document for your local electrician
  • Airflow CFM CFM requirement schematic with recommended fan models
  • Follow-up review call after electrician quote review
What is Excluded:
  • Physical civil works or direct electrical wiring (conducted by your electrician)
  • Permit applications to local municipal councils

Operational Stages & Delivery Breakdown

1. Site Walkthrough

Inspect power incoming mains, neutral-earth bonding, and physical shed orientation relative to prevailing winds.

2. Environmental Baseline

Record ambient temperature variations, dust ingress risks, and boundary noise baselines.

3. Calculation & Schematic

Calculate heat dissipation requirements (BTU/hr to CFM airflow) and electrical load curves.

4. Delivery & Debrief

Provide a complete binder with CAD layout schematics, bill of materials, and safety protocols.

Ready to Secure Your Placement?

Direct hands-on bench allocations are strictly capped to ensure individual instructor supervision and complete access to electrical and diagnostic equipment.

Submit Booking Inquiry